Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Rigging - EuroLite LED TMH-X25 Moving-Head Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION

Rigging

The installation of the projector has to be built and constructed in a way that it can hold 10 times the weight
for 1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
(12) Carrying handle
(13) 3-pin DMX output
(14) 3-pin DMX input
(15) 5-pin DMX output
(16) 5-pin DMX input
(17) Fuseholder
(18) Power output
(19) Power input
29/44
00092193.DOC, Version 1.1

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

51785991

Inhaltsverzeichnis