Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connection; Accessories; Maintenance And Cleaning; Disposal - WIKA A2G-80 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 11
6. Commissioning, operation ... 9. Disposal
3. After running for about 30 minutes, check the output signal. The
voltage should be in the range of 1 ... 3 V. With a too high/low voltage,
correct the value accordingly
with the trim potentiometer on
the PCB:
GB
Turn the potentiometer to the left
until the red LED just goes out.
The output signal will now be
approximately 0.7 V.
4. The sensor is now ready to be
used - the voltage of the output
signal will rise as the air quality
worsens.

7. Accessories

Standard accessories
Mounting flange

8. Maintenance and cleaning

Clean the instruments with a moist cloth (soap water).
Repairs must only be carried out by the manufacturer or appropriately
qualified skilled personnel.

9. Disposal

Incorrect disposal can put the environment at risk.
Dispose of instrument components and packaging materials in an
environmentally compatible way and in accordance with the country-
specific waste disposal regulations.
10

Electrical connection

WIKA operating instructions air2guide model A2G-80
T
rim potentiometer
Offset
Operating LED

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis