5. First steps before operation

This equipment has been tested thoroughly for functionality and
possible external damage before it leaves the factory. Transport
damages still can't be completely ruled out.
Carefully unpack the unit and check for damage and completeness
of the delivery. Please recharge the unit before initial startup for
about 5 hours with the included AC adapter. The unit should be
never charged for more than 12 hours.

6. Operation

Press the main switch (10) on the right side of the unit. The
®
PeakTech
9022 starts and the main menu is displayed.
®
To turn off the PeakTech
9022 after use, press the power switch
(10) again.