5.2.8 Using the Phase Sequence Function
Determining the Phase Sequence
Initial screen of the
Phase Sequence Measurement
1. Turn the rotary switch to the VOLTAGE position
2. Press F1 to make symbol is displayed
3. Connect the test leads L1, L2, L3 as shown on theFigure 5.2.6.2
4. When the instrument is energized the sequence will be displayed automatically
Phase Sequence screen -when connected in clockwise direction.
Phase Sequence –
Test lead connection
-82-