13.2
Delivery scope and transport inspection
As a rule, the Egg Boiler is delivered with the following components:
Egg boiler
Lid
Egg tray
Measuring cup with egg piercer
Operating Instructions
► Examine the shipment for its completeness and for any visible damages.
► Immediately notify the carrier, the insurance and the supplier about any incomplete
shipment or damages as a result of inadequate packaging or due to transportation.
13.3
Setup location requirements:
In order to ensure the safe and trouble-free operation of the device, the setup location
must fulfil the following prerequisites:
The device must be set up on a firm, flat, horizontal and water-resistant surface with
sufficient load-bearing capacity for the air humidifier and content.
Choose the setup location in such a way that children cannot reach the device.
The device is not intended to be installed in a wall or a built-in cupboard.
Do not set up the device in a hot, wet or extremely damp environment or near
flammable material.
Do not cover up any openings on the device and do not block these off.
The electrical socket must be easily accessible so that the power lead can be
disconnected easily, in the case of an emergency.
The installation and assembly of this device in non-stationary setup locations (e.g. on
ships) must be carried out by specialist companies / electricians, provided they
guarantee the prerequisites for the safe use of this device.
13.4
Unpacking
Remove the device out of the carton, remove the packaging material, shovel and
measuring container.
13.5
Disposal of the packaging
The packaging protects the device against damages during transit. The packaging
materials are selected in accordance with environmentally compatible and recycling-
related points of view and can therefore be recycled.
caso Eierkocher
Please note
25