Commissioning, maintenance, testing

The installation and operation of electrical locking systems for doors in
escape routes are subject to building supervisory regulations. Adherence
to these regulations must be ensured by both the installer and the opera-
tor.
9.1

Commissioning and recurring tests

Prior to initial commissioning of an electrical emergency exit locking system,
correct installation of all elements and their electrical connection must be chek-
ked. Particular care must be applied here to the elements for releasing the
locking system in case of danger.
As a rule, the correct mounting and function of the electrical emergency exit
locking system must be approved by an expert.
In addition, doors in escape routes which are fitted with electrical locks must be
tested at least once a year by an expert. The expert is required to issue a certifi-
cate confirming repeated testing, which the user must present to the building
supervisory authorities on request.
Note!
The instructions provided above relate to standard specifications. As the
application of escape route locking systems is regulated on the Federal
State level, the relevant State Government building legislation and test
stipulations for technical equipment must be observed.
9.2

Maintenance

The devices described here do not require maintenance. Should faults occur
during operation or in one of the prescribed tests which are not caused by faulty
installation or mounting, the relevant device must be decommissioned imme-
diately and sent to the manufacturer for checking.
Freedom from maintenance does not exonerate the user from the obligation to
perform regular tests of the emergency exit locking system.