ASSEMBLY
CAUTION:
One side of the roof panels is UV protected. Ensure to put the UV
protected side facing the sun. It is a very important procedure; if not
followed as described, your roof will not be covered by the warranty.
NOTE:
The roof panels are covered with a plastic film identifying which side
has a UV protector. Once the plastic film is removed it is impossible
to know which side has the UV protector. We recommend removing
the film one at a time just prior to installing the roof panel.
Step 13
13.1 Install the left roof panels (Mb) and the
right roof panels (Nb) according to the picture.
13.2 Insert middle roof panel (Z1) from the end
of the roof bars in the middle of the 14 ft. side
of the shelter.
Repeat this step for all remaining roof panels.
Parts required for this step / Benötigte Teile:
28
Mb
4
AUFBAU
ACHTUNG :
Die UV-beständige Seite ist mit einem Aufkleber versehen.
Diese Seite muss zwingend nach Außen! Entfernen Sie den Aufkleber
während des Einbaus der Scheibe. Bei einem falschen Einbau entfällt
die Garantie.
Schritt 13
13.1 Setzen Sie die linke Dachplatte (Mb) und die
rechte Dachplatte (Nb) wie abgebildet ein
13.1 Setzen Sie anschließend die Dachplatte (Z) ein und
schieben diese ebenfalls in die Dachstreben (E) ein.
Führen Sie diesen Schritt auf beiden Längsseiten durch.
Nb
4
© Sojag inc. 2015
Z1
2