Herunterladen Inhalt Inhalt Diese Seite drucken

Mitsubishi Electric City Multi PLFY-P25VEM-E Installationshandbuch Seite 15

Air-conditioners for building application indoor unit
Vorschau ausblenden Andere Handbücher für City Multi PLFY-P25VEM-E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 17
A Main unit
A
B Corner of drain pipe
C Claw on the main unit
B
D Grille 1
E Hole on the grille
F Hook for temporary installation
G Screw with captive washer
C
H Ceiling surface
J No gap
K
E
F
D
< The grille temporary installed >
C
D
C
D
B
A
A
D
C
E
B
B
A
C
E
F
G
Position 1
Prohibited installation
position
Drain pipe
etc.
J
A
H
D
G
K
A Clamp of the main unit
B Electrical box
C Lead wires of the grille
D CNV connector on the controller board
F
H
G
A CN4Z on the controller board
B CN5Y on the controller board
C Lead wire of i-see Sensor corner panel
D Clamp
E Hole of grille (Pass the lead wire.)
F Screw 3
G i-see Sensor corner panel 4
Position 2
Position 3
Refrigerant pipe
and put them together temporarily by hanging the hook of the grille to the claw of
the main unit.
Note:
Make sure there is no gap between the main unit and the grille or between the
grille and the ceiling surface. (Fig. 6-6)
If there is a gap between the grille and the ceiling:
clear the gap.
Caution:
cover to open.
nector (white) on the controller board of the main unit.
into the electrical box.
Route the lead wire (white, 9 poles) for signal receiver corner panel from the side
of the electrical box on the main unit.
the claw of bellmouth.
the electrical box.
Note:
Make sure wires are not caught in the electrical box cover.
The signal receiver corner panel can not be installed on the drain pipe side for the
main unit. (Refer to Fig. 6-11)
A Signal receiver corner panel
B Hole of grille (Pass the lead wire.)
C Claw of bell mouth
D Wire
E Clamp
F Cable band (Secure the lead wire.)
G CN90 on controller board
H Screw
sor corner panel 4 from the side of the electrical box on the main unit and connect
to the connector CN4Z and CN5Y on the controller board.
slack using the clamp into the electrical box.
Note:
Make sure wires are not caught in the electrical box cover.
* If the position of the i-see Sensor was changed from default position (position 3)
to the other position, change the function settings. (Fig. 6-11)
unit. (Refer to Fig. 6-11)
Position 1
Position 2
Position 3
-
-
1 with screw 3.
15

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis