Herunterladen Inhalt Inhalt Diese Seite drucken

Installing Controller - Sonnenkraft RAS20 Handbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Hydraulic connection, top
Caution!
Counterhold when tightening the compression fittings on
the ball valve [A]!
Then install the piping to be connected on the tank
(If necessary, refer to the SONNENKRAFT Diagram Manu-
al at www.sonnenkraft.com).

Installing controller

Controller is already premounted and prewired.
Attach tank probe to the tank (see SONNENKRAFT
diagram manual).
Installation of insulation
For tank installation, put the cable duct on the insula-
tion ring and push them together onto the station. It
engages on top at the pipes and on the bottom at the
corrugated pipe. Put on front shell and let it catch on
the insulation ring.
For wall mounting, let the insulation ring for pipe chan-
nels disengage downward at the prepared locations and
push it onto the station. It engages on the pipes on top
and on the bottom. Put on front shell and let it catch on
the insulation ring.
Do not clamp in any cables.
Remove the front shell by carefully pulling it up and down
in alternating movements.
GB
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis