Herunterladen Inhalt Inhalt Diese Seite drucken

Bauknecht DNV 5390 IN Benutzerhandbuch Seite 15

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATION - ASSEMBLY INSTRUCTIONS
The instructions below, to be carried out in the order in which they are numbered, refer to the figures (with the same step numbers) given on the last pages of
this manual.
1.
Feed through the power supply cable and secure the cable clamp (using n.1 screw 3.5x9.5).
2.
Install the collar on the exhaust outlet hole with 2 screws.
3.
Position the wall unit shelf at a height of 26 cm from the bottom.
4-5-6. Position the drilling template on the bottom of the shelf, drill the 4 Ø 5mm side holes and prepare the central opening for the air vent.
7.
For the upper outlet: drill the top of the wall unit, taking into account the position of the outlet hole.
8.
For the rear outlet: drill the back of the wall unit in the middle at the desired height.
9.
Secure the hood to the wall unit using the 4 screws 4.2x35.
10-11. Fit ducting for the venting of fumes, connecting it to the collar (for the Filter version, a small section of ducting that reaches the top of the wall unit will
suffice).
N.B.: The pipe is not included in the pack and must be purchased separately.
12.
Open the steam deflector and remove the metal grease filters.
13.
Install the brackets for adjusting the deflector.
14.
For Filter Version only: fit the carbon filter (refer to instructions in the section MAINTENANCE-Carbon Filter).
15.
Refit the metal grease filters.
GB13

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis