Painting
Marble/granite
products for surface treatment of the stone
For your own safety, comply with the assembly
Panama EU - Straight / Corner
instructions. All safety distances are minimum distances.
Installation of the insert must comply with the rules and
regulations of the country where installed. Nordpeis AS
is not responsible for wrongly assembled inserts.
We accept no liability for typographical errors and
changes.
NB! See separate instructions for the insert
prerequisite for cooling down a combustible wall.
The air gap must not under any circumstances be
The result is that small cracks may appear in the
concrete/masonry.
Use the fireplace for a few months. If cracks appear,
scrape them out with a screwdriver or similar (to provide
more space for acrylic joint filler). Vacuum the surfaces
to remove any dust.
Insert
Inject acrylic joint filler and even it out with a spatula or
a finger wetted with soapy water.
The joint can be painted after a couple of days
Steel chimney
When the fireplace has been filled/sanded and the
glued joints are dry, the fireplace is ready to be painted.
Use only breathable paint (acrylic) intended for
masonry.
Clean the plates with mild soapy water and remove any
residue of spilled glue.
Never use acid/abrasive materials, as this will damage
the surface and polishing.
It is important to use detergent/sealant that is approved
for marble for cleaning and sealing.
Scratches in dark marble can be coloured with a pencil.
A professional stone centre can help you with different
Attention! The airflow behind Panama is a
covered as this may cause a fire.
Q-34AL (R/L) / Q-23 FL
Can be connected to steel chimney.
Weight including insert
Panama EU Standard
Panama EU Standard
Weight - extra elements
Panama EU extension
Panama EU front bench set
Panama EU woodshelf
Panama EU woodshelf high
Floorplate
Safety Distances (FIG 2)
*The illustration indicates the approximate centre height
the flue prior to perforating the chimney. Distortions in
floors and walls may influence the height. Dry stack
Fresh air supply (accessory)
with integrated firewall / Q-23 FL
with integrated firewall / Q-34AL (R/L)
Panama EU Low / Q-23 FL
Panama EU Low / Q-34 AL (R/L)
Assembly instructions FIG 3-20
GB
Please follow the rules and regulations regarding
floorplates in your country.
Minimum measurements firewall
Panama has an integrated firewall and can be
mounted directly against a combustible wall. Make sure
to follow the rules regarding insulation of the smoke
pipe in your contry.
Ensure that the safetdistances are complied with.
Please note that these safety distances can vary from
country to country.
Illustration (FIG 1A/1B Panama=mm)
of the hole for the flue. Consider possible inclination of
the fireplace for accurate height and positioning of
the flue/chimney connection. If a fresh air supply set
(accessory) is connected through the floor, prepare the
bottom element before assembly.
ATTENTION! The product can only be connected to
the fresh air supply through the pre cut areas in the
surround (See FIG Panama =AIR). Seal off the gap
between the fresh air hose and the concrete with a
non combustible sealant, Rockwool etc
For more information see separate assembly
instructions for fresh air supply.
400 kg
409 kg
380 kg
389 kg
70 kg
140 kg
200 kg
220 kg
3