Installing the Appliance
Wall Mounted
11
12a
7.2.1
112
112
Wall Drilling and Bracket Fixing - Wall Marking:
■ Draw a vertical line on the supporting wall up to the
ceiling, or as high as practical, at the centre of the
area in which the hood will be installed.
■ Draw a horizontal line at 650 mm above the hob.
7.3
■ Place the bracket (Ref. 7.2.1) on the wall as shown
about 1-2 mm from the ceiling or upper limit aligning
the centre (notch) with the vertical reference line.
■ Mark the wall at the centres of the holes in the
bracket.
■ Place another bracket (Ref. 7.2.1) on the wall as
shown at X mm below the first bracket (X = height
of the upper chimney section supplied), aligning the
centre (notch) with the vertical line.
■ Mark the wall at the centres of the holes in the
brackets.
■ Mark a reference point as indicated at 112 mm from
the vertical reference line and 320 mm above the
horizontal reference line.
■ Repeat this operation on the other side.
■ Drill ø 8 mm holes at all the centre points marked.
■ Insert the wall plugs (Ref. 11) in the holes.
■ Fix the lower bracket (Ref. 7.2.1) using the 2 screws
(Ref. 12a) supplied.
■ Fix the upper bracket (Ref. 7.2.1) and the air outlet
connection support (Ref. 7.3) together using the 2
screws (Ref.12a) supplied.
■ Insert the 2 screws (Ref.12a) supplied in the hood
body fixing holes, leaving a gap of 5-6 mm between
the wall and the head of the screw.
21
EN