Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Onto The Pipe; Recommandations For Installing The S020 Fitting On The Pipe - bürkert S020 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für S020:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installationandcommissioning
P (bar)
16
15
14
13
12
PVDF
11
10
9
8
PVC + PP
7
6
5
4
PVC (PN10)
3
2
PP (PN10)
1
0
-20
0
+20 +40 +60 +80 +100 +120
Fig. 5:
Fluid pressure / temperature dependency curves for T-fit-
tings used on their own
Type S020
Metal (PN16)
PVDF (PN10)
+150
7.2.

installation onto the pipe

7.2.1.
Recommandations for installing the
S020 fitting on the pipe
To measure the pH or the oxidation reduction potential, install
a U-shaped bypass in order to prevent the electrode drying out
and to allow calibration without stopping the process.
T (°C)
Fig. 6:
Bypass installation of the fitting
For measuring the flow and depending on the design of the
pipes, respect the minimum distances in accordance with the
standard EN ISO 5167-1, from which the diagrams in Fig. 7 are
excerpted.
English
27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis