Herunterladen Diese Seite drucken

hager EE600 Bedienungsanleitung Seite 6

Vorschau ausblenden Andere Handbücher für EE600:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 8
Installation
1- Screw the block to the wall
2- Connect the wires as shown in the diagram
3- Clip the projector onto the block
(a click confirms the connection)
4- Screw the floodlight onto the block
(screws located behind the detector head).
Dimensions
150 mm
L
N
322 mm
180 mm
257 mm
q
Warning :
This device is to be installed only by a
professional electrician fitter according
to local applicable installation standards.
7
Clac !
Adjustments
Fixed time
(length of time
of lighting)
a
b
c
Detection zones
vue 30-30°
Clac !
clac
150 mm
2,5 m
Ø 6 m
8 m
12 m
Optimal installation height is 2.5m.
322 mm
The detection zone shall remain free of obstacle.
8
vue 30-30°
Testing and validating
the detection zone
Luminosity
Sensitivity
Put the potentiometer
2
(modification
if necessary, use the shutters to define the
of the range)
detection zone.
vue 30-30°
ech40%
The Test mode is available for 3 min. Every
L
movement detected switches on the light for 1s.
N
After 3 min without detection of movement, the
product returns to normal operation.
"Normal" operation (on/off)
The light panel switches on when the luminosity
level defined by potentiometer 2 is judged to be
insufficient and when a movement is detected.
After detection, the light stays on for the length
of time predefined by the potentiometer 1. The
fixed timing is reset after each detection.
Please note : when the potentiometer 2 is on
"auto test", the settings are predefined (See table
180 mm
below).
257 mm
on Test mode and
z

Werbung

loading