IMPORTANT
Please read these instructions carefully before you start to assemble this product .
Please carry out the steps in the order set out in these instructions.
Keep these instructions in a safe place for future reference.
Safety Advice
For safety purposes we strongly recommend the product to be assembled by at least two people.
Some parts may have sharp edges. Please be careful when handling components. Always wear gloves,
eye protection, and long sleeves when assembling or performing any maintenance on your product.
Do not attempt to assemble the product in windy or wet conditions.
Do not attempt to assemble the product if you are tired, have taken drugs,
medications or alcohol, or if you are prone to dizzy spells.
Dispose of all plastic bags safely - keep them away from children's reach.
Keep children away from the assembly area.
When using a stepladder or power tools, make sure that you are following
the manufacturer's safety advice.
Keep roof and gutters clear of snow, dirt & leaves.
Heavy snow load on the roof can make it unsafe to stand below or nearby.
Do not lean against or push the product during construction.
Hot items such as recently used grills, blowtorches etc. must not be stored inside the product.
Heavy or sharp articles should not be leaned against the wall panels.
Make Sure there are no hidden pipes or cables in the ground before inserting the pegs (not supplied)
Do not touch overhead power cables with the aluminum profiles.
If color was scratched during assembly it can be fixed.
Note:This product must be anchored on to a leveled surface and solid foundation to ensure its stability.
Make sure that screws and anchors are compatible with foundation type. Make sure that there are no
obstructions between the assembly area and the final position.
Cleaning Instructions
In order to clean the product, use a mild detergent solution and rinse with cold clean water.
Do not use acetone, abrasive cleaners, or other special detergents to clean the panels.
Clean the product once assembly is complete.
Before Assembly
Choose your site carefully before beginning assembly.
The ground surface must be perfectly flat and leveled.
Choose a sunny area, away from overhanging trees.
Do not position your product in an area exposed to excessive winds.
The product must be positioned and fixed onto a flat leveled surface.
We strongly recommend to secure this product directly onto a solid foundation.
Use the pre -drilled holes in the steel base.
Complete site preparation before unpacking parts and beginning assembly.
Sort the parts and check against the content parts list.
Parts should be laid out close at hand. Keep all small parts (screws etc.) in a bowl so they do not get lost.
Please consult your local authorities if any permits are required prior to constructing the product.
During Assembly
Make sure the base is square by measuring the diagonals and level by using a spirit level.
You may use silicone lubricant spray in order to help you slide the panels into the profiles.
Do not spray the polycarbonate panels.
Use a rubber mallet if necessary.
MWhen encountering the information icon, please refer to the relevant assembly
step for additional comments and assistance.
Attention
During assembly use a soft surface below the parts to avoid scratches and damages.
Steps
Step 3: While anchoring the product to the ground, make sure you allow free movement of item
#4. Refer to the drawing marked at the bottom of the page + "Foundation SNG 8"' page.
Step 6: After connecting profiles 816 to each other clean the connection area using a cloth.
Place the cover strip on the connection only when it is clean and dry.
Step 8: After connecting profiles 816 to each other clean the connection area using a cloth.
Place the cover strip on the connection only when it is clean and dry.
Step 9+10: Use part 95 as a template in order to measure the gap between posts of the
greenhouse wall and roof area.
Step 10: Profile 841 should be placed on the right hand side. Profile 840 should be placed on the
left hand side when viewed from the front.
Step 11: Slide the panel 566 till the end of the rail and insert it into it's final position as shown in
illustration d.
Step 17+21: Refer to page "Mounting window" for options of where to installe the window.
Step 20+21: If the window doesn't close properly, please release the screws, adjust the profile and
re -tighten the screws.
Step 35: Profiles 814 should be inserted from the four corners of the greenhouse, then insert
profile 815 in between them.
Step 36: Ensure you use long screw 450 to secure the door catch 34 as shown in illustration a.
* Please tighten all screws when completing assembly.
Screws 411 and nuts 466 are used throughout the assembly process.
Screws 411 are to be assembled from the outside and nuts 466 from the inside of the greenhouse.
If not specified otherwise, do not fasten screws and nuts (411 & 466) for more
than 2-3 turns. Do not tighten them until completion of the panels'assembly.
These 2 icons indicate if screw's tightening is required or not.
. However, in some steps, temporary tightening of a few screws may be needed to prevent a
profile from sliding out.
Note: Firmly c
.
.
- immediately after completion of the assembly.
Anchoring this product to the ground is essential to its stability and rigidity. It is required to
complete this stage in order for your warranty to be valid.