Herunterladen Inhalt Inhalt Diese Seite drucken

Waeco AirConServiceCenter ASC3300G Bedienungsanleitung Seite 91

Vorschau ausblenden Andere Handbücher für AirConServiceCenter ASC3300G:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
AirConServiceCenter
4. Press ENTER to confirm both settings.
I
NOTE
The air conditioning system is drained completely by the vacuum pump.
This is used to remove any remaining carrier gases or moisture, and to
prepare the air conditioning system for the filling process.
8.7.3
Filling process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Filling phase" has been selected, enter the required value, oth-
erwise continue with chapter "Selecting connections" on page 92.
3. Enter the refrigerant oil quantity.
4. Press the cursor key .
5. Enter the additive quantity.
6. Press the cursor key .
7. Enter the refrigerant quantity.
8. Press ENTER to confirm all settings.
I
NOTE
 If extraction is taking place in the same process sequence, the
quantity of fresh oil is counted as an additional filling quantity, and is
added to the drained oil quantity extracted beforehand. If this value
is set to 0, exactly the quantity of oil which was extracted will be filled
again.
 To add fresh oil or UV additive, a vacuum process must be per-
formed in the same process sequence. If no vacuum process has
been selected, only refrigerant can be selected in the filling menu.
EN
Vacuum time
Leak Test
ENTER-OK STOP-EXIT
Filling phase?
ENTER-OK STOP-EXIT
PAG oil
UV tracer
Refrigerant
ENTER-OK STOP-EXIT
min.
20
min.
4
Yes
No
ml.
5
ml.
7
g.
500
Operation
91

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis