Herunterladen Inhalt Inhalt Diese Seite drucken

Setup; Delivery Content; Before First Operation - Zipper Maschinen ZI-BG 100 Originalbetriebsanleitung

Betonglätter
Vorschau ausblenden Andere Handbücher für ZI-BG 100:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

13

SETUP

13.1

Delivery content

Check your ZI-BG100 after unpacking for transport damages. Report any transport damages
you find IMMEDIATELY to your reseller.
Additional Equipment is optional!
Attention! Due to transport security reasons there is no gear and motor oil filled in. You have
to acquire and fill in separately!
Check the Power trowel for impurities, especially the carburetor and the air filter.
Clean if necesary.
Do not use paint thinners, petrol, aggressive chemicals or detergents for cleaning.
They damage the machine surface!
13.2

Before first operation

ATTENTION!
Low Oil levels lead to engine damages and dramatically reduce your engines
lifespan.
Warranty claims regarding engine defects can not be accepted if they prove to
be a causal consequence of insufficient upkeep maintenance and engine service.
ZIPPER MASCHINEN GmbH
BETONGLÄTTER / POWER TROWEL
Power trowel
Operation Manual
www.Zipper-Maschinen.at
ZI-MOS145Gite 22
H I N W E I S
Check securing nuts, screws for being
screwed down tightly. Nuts and screws
can become loose with time and lead to
machine part breaks or even accidents.
Check petrol pipe, fuel tank cap and fuel
tank for leaks.
SETUP
Seite 22

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis