Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly; Preparation; Checking Delivery Content; Requirements For The Installation Site - Zipper Maschinen ZI-KGS210DS Betriebsanleitung

Kapp- und gehrungssäge
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

14

ASSEMBLY

14.1

Preparation

14.1.1

Checking delivery content

Check the delivery immediately for transport damage and missing parts. Report any damage or
missing parts to your dealer or the shipping company immediately. Visible transport damage must
also be noted immediately on the delivery note in accordance with the provisions of the warranty,
otherwise the goods are deemed to have been properly accepted.
14.1.2

Requirements for the installation site

The selected installation site must ensure a suitable connection to the electrical mains, as well as a
connection to an extraction system. Observe the safety requirements and the dimensions of the machine.
Place the machine on a level, solid surface. The chosen installation site of the machine must comply with
the local safety regulations as well as the ergonomic requirements for a workplace with sufficient lighting
conditions.
Ensure that the selected workplace (machine stand, worktop,...) can bear the load of the machine and that
the machine can be attached to it using screws.
The base of the machine has fixing holes by means of which the machine is firmly connected to the floor.
This prevents movement of the machine during operation and possible damage or injury. The machine
must be levelled at all support points at the same time. In addition, a distance of at least 0.8 m around the
machine must be secured all around. The necessary space for feeding long workpieces must be provided.
Hole pattern for machine mounting:
14.2

Assemble

The machine has been disassembled for transport and must be reassembled before use. Follow the
instructions below:
ZIPPER MASCHINEN GmbH
www.zipper-maschinen.at
Required mounting material is not included in the scope of delivery.
Anchoring to the ground
• Anchor both sides of the machine (1) to the floor of
N O TE
the installation site using appropriate fixing bolts.
ASSEMBLY
34
ZI-KGS210DS

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis