Herunterladen Inhalt Inhalt Diese Seite drucken

Waeco AirConServiceCenter ASC2300G Bedienungsanleitung Seite 96

Vorschau ausblenden Andere Handbücher für AirConServiceCenter ASC2300G:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
Operation
8.7.1
Recovery phase
1. Enter the preferred settings and press ENTER to confirm.
2. If "Rec/Recycling phase" has been selected, enter the preferred
waiting time for the pressure increase (standard is 5 min.) in the
following menu and press ENTER to confirm, otherwise continue
with chapter "Vacuum process" on page 96.
I
NOTE
The waiting time ensures that any residual refrigerant vaporises and
can then be extracted. The vaporising residual refrigerant triggers an
increase in pressure.
8.7.2
Vacuum process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Vacuum phase" has been selected, enter the preferred vacuum
time (standard is 20 min.), otherwise continue with chapter "Filling
process" on page 97.
3. Use the cursor key  to enter the vacuum phase time.
4. Press ENTER to confirm both settings.
I
NOTE
The air conditioning system is drained completely by the vacuum pump.
This is used to remove any remaining carrier gases or moisture, and to
prepare the air conditioning system for the filling process.
96
All manuals and user guides at all-guides.com
Rec/Recycling
phase?
ENTER-OK STOP-EXIT
Pressure increase
Test time
ENTER-OK STOP-EXIT
Vacuum phase
ENTER-OK STOP-EXIT
Vacuum time
Leak Test
ENTER-OK STOP-EXIT
AirConServiceCenter
Yes
No
min.
5
Yes
No
min.
20
min.
4
EN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis