Herunterladen Inhalt Inhalt Diese Seite drucken

Bosch DKE 115 Serie Gebrauchs- Und Montageanweisung Seite 28

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Installation
08. Screw the extractor hood tightly onto the
support frame (4 screws).
2.
If the extractor hood does not line up
properly, loosen the 4 screws in the
ceiling and adjust the position within
the elongated holes.
Following this adjustment, ensure that
the screws are tightened again.
09. Connect the air outlet pipe.
10. Connect the hood to the electricity
supply.
28
operated in recirculating mode.
1.
11. Remove the protective film from the
12. Insert both sections of panelling into
If the extractor hood is going to be
Before mounting the chimney cover
panels, attach the enclosed adhesive
sealing strips around the air outlet slits.
two flue ducts.
Take care not to damage the
stainless steel surfaces which are
susceptible to scratches etc.
the extractor hood, push them up
against the support frame and secure
them in place with 2 screws at the side.
3.
2.
1.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis