Herunterladen Inhalt Inhalt Diese Seite drucken

Unpacking, Setup And Commissioning; Installation Site, Location Of Use; Unpacking/Installation - KERN EMS Serie Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für EMS Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5 Unpacking, Setup and Commissioning

5.1 Installation Site, Location of Use

The balances are designed in a way that reliable weighing results are achieved in
common conditions of use.
You will work accurately and fast, if you select the right location for your balance.
Therefore, observe the following for the installation site:
• Place scales on a stable, even surface;
• Avoid extreme heat as well as temperature fluctuation caused by installing next to
a radiator or in the direct sunlight;
• Protect the balance against direct draughts due to open windows and doors;
• Avoid jarring during weighing;
• Protect the balance against high humidity, vapours and dust;
• Do not expose the device to extreme dampness for longer periods of time. Non-
permitted condensation (condensation of air humidity on the appliance) may occur
if a cold appliance is taken to a considerably warmer environment. In this case,
acclimatize the disconnected appliance for ca. 2 hours at room temperature.
• Avoid static charge of goods to be weighed and weighing container.
Major display deviations (incorrect weighing results) may be experienced should
electromagnetic fields (e.g. due to mobile phones or radio equipment), static
electricity accumulations or instable power supply occur. Change location or remove
source of interference.

5.2 Unpacking/installation

Carefully remove the balance from the packaging, remove plastic cover and setup
balance at the intended workstation.
The balance must be installed in a way that the weighing plate is exactly in horizontal
position.
8
EMS-BA-e-1716

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis