Herunterladen Inhalt Inhalt Diese Seite drucken

Security Tips; Servicing - profi-pumpe SCREW-STAR 370-4 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mount the THERMAL PROTECTOR SWITCH BOX (ONLY INCLUDED WITH THE BRUNNEN-STAR 750-4) at a place
suitable according to the protective class. Assure that a 30mA RCD circuit breaker secured outlet is installated. Then install the
pump cable in the thermal protective switch box. Lead the cable through the screw connection opening from the outside into the
box. The wires are marked with numbers.
Secure the cables in the electrical clamp strip according to the numberings (See fig. 3). Tighten the screw connection of the
cable realisation and screw the lid together. Pay attention that the rubber sealing ring sits tight.
Flexible hose
Panzerschlauch
Thermal protector
Towing rope
Zugseil
fig.1

5. SECURITY TIPS

l Obey absolutely valid regulations on the electrical security
l Never run pump dry
l Pumping inflammable, as well as all other aggressive liquids is prohibited
l Pay attention to the medium temperature max. 35°C
l Never pull the pump on the electrical cable or pressure hose
l Disconnect the plug immediately from the power grid when the line has been damaged or severed
l Avoid cross section narrowing
l Pay attention to the given particle size
l During longer unused times, clean the pump, wash it out with clear water, dry and store it at room temperature
l Test wells for enough flowing water (dry run danger)
l The pump is to be secured through a RCD circuit breaker with a release current of 30 mA.
l The electrical connections are always to be carried out by an authorised professional
l Operation can not be performed by children and young people under 16 and people with intellectual disabilities
THE MANUFACTURER EXPLAINS:
l To assume no responsibility in case of accidents or damage caused by negligence or disregard of the instructions
in this book
l Any responsibility for damage caused by improper use of the pump and disregard of applicable EN - arise DIN
standards and other standards and state of the art rejected.

6. SERVICING

Under normal pumping conditions the pump requires no servicing. From an operating period (with clear
water) of approx. 2000 hours the mechanical components should be checked: impeller wheels, chambers,
sealing rings etc. on wear and if necessary be changed. After 3000 pumping hours the oil in the chamber
should also be changed, if necessary (only with oil-dipped engine types!). Please, only fill it up to 80% and
check the sealing rings always for density.
With abrasive materials like sand the servicing duration can become shorter.
The following controls should be carried out regularly:
l Intactness of the electric cable
l That the connection hoses are not bent or broken
l Cleanness of the pump medium
Moreover, the pump should be emptied with risk of frost, be washed out with clear water and stored dry.
switch box
Motor Schutz-
schalter-Box
fig.2
fig.3
English 3

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Screw-star 550-4Screw-star 750-4Screw-star 1100-4Bps01128Bps01129Bps01130 ... Alle anzeigen

Inhaltsverzeichnis