Herunterladen Inhalt Inhalt Diese Seite drucken

Before Starting The Equipment - EINHELL 42.572.11 Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für 42.572.11:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Limit the operating time.
All stages of the operating cycle must be conside-
red (for example, times in which the electric tools
are switched off and times in which the tool is
switched on but operates without load).

5. Before starting the equipment

Be sure to read the following information before
you use your cordless screwdriver for the fi rst
time:
1. Charge the battery pack with the charger sup-
plied.
2. Only ever use sharp drill bits and screwdriver
bits which are suitable for the purpose and in
faultless condition.
3. Always check for concealed electric cables
and gas and water pipes when drilling and
screwing in walls.
6. Operation
6.1 Charging the LI battery pack (Fig. 2-3)
1. Remove the battery pack (5) from the handle,
pressing the pushlock buttons (8) downwards
to do so.
2. Check that your mains voltage is the same as
that marked on the rating plate of the battery
charger. Insert the power plug of the charger
(6) into the mains socket outlet. The green
LED will then begin to fl ash.
3. Push the battery pack onto the battery char-
ger.
In section 10 "Charger indicator" you will fi nd a
table with an explanation of the LED indicator on
the charger.
If the battery pack fails to become charged, ple-
ase check
whether there is voltage at the socket-outlet
whether there is proper contact at the char-
ging contacts on the charger.
If the battery still fails to become charged, please
return
the charger
the battery pack
to our Customer Service Department.
Anl_TE_CD_18_2_Li_SPK13.indb 16
Anl_TE_CD_18_2_Li_SPK13.indb 16
GB
To ensure that items are properly packaged
and delivered when you send them to us,
please contact our customer service or the
point of sale at which the equipment was
purchased.
When shipping or disposing of batteries and
cordless tools, always ensure that they are
packed individually in plastic bags to prevent
short circuits and fi res.
To ensure that the battery pack provides long ser-
vice, you should take care to recharge it promptly.
You must recharge the battery pack when you
notice that the performance of the device drops.
Never allow the battery pack to become fully di-
scharged. This will cause it to develop a defect.
6.2 Torque setting (Fig. 4 / Item 1)
Important! The tool must be at a standstill
when you set the torque with the setting ring.
The cordless screwdriver is fi tted with a mechani-
cal torque selector.
The torque for a specifi c size of screw is selected
with the set-collar (1). The correct torque depends
on several factors:
on the type and hardness of material in ques-
tion
on the type and length screws used
on the requirements needing to be met by the
screwed joint.
The clutch disengages with a grating sound to
indicate when the set torque is reached.
6.3 Drilling (Fig. 4/Item 1)
For drilling purposes, adjust the setting ring for
the torque to the last setting "Drill". In the drill
setting the slip coupling is non-functional. The
maximum torque is available for drilling.
6.4 Forward/Reverse switch (Fig. 5 / Item 3)
With the slide switch above the On/Off switch you
can select the direction of rotation of the battery-
powered drill/screwdriver and secure it against
being switched on accidentally. You can choose
between clockwise and anticlockwise rotation. To
avoid causing damage to the gearing it is advisa-
ble to change the direction of rotation only when
the tool is at a standstill. The On/Off switch is blo-
cked when the slide switch is in centre position.
- 16 -
28.09.2021 07:46:42
28.09.2021 07:46:42

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Te-cd 18/2 li

Inhaltsverzeichnis