All manuals and user guides at all-guides.com
7
Commissioning
Before switching on
7
Commissioning
Before switching on
)
Note!
If you carry out the commissioning with a configuration different from the
ƒ
Lenze setting, read the instructions on "Individual Settings" (^ 42).
Make sure
ƒ
– that you have correctly set the setpoint range with the DIP switch on
the function module (^ 41).
– that C0034 is adjusted to the settings of the DIP switch (^ 41).
Example: setpoint selection (0 V ... +5 V) via potentiometer at X3/7,
X3/8 and X3/9
ð
40
C0034 = 0, DIP switch 1, 2, 4 and 5 = OFF, 3 = ON
l
EDK82ZAFSC DE/EN/FR 5.0