Herunterladen Inhalt Inhalt Diese Seite drucken

Bosch EPS 708 Montageanleitung Seite 49

Common rail prüfstand
Vorschau ausblenden Andere Handbücher für EPS 708:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
8.
Concluding operations
1. Close all PC applications.
2. End the operating system.
3. Switch off the EPS 708 at the master switch.
4. Pour in test oil as far as the upper notch on the
dipstick (see Section 4.12).
5. Check whether the inlet cock at the chiller (refer to
Fig. 20, Pos.1) is closed.
6. First remove the chiller filler hose from the water
mains at the water cock and drain. Then remove the
hose from the chiller at the inlet cock. Collect the
residual quantity.
7. Seal the inlet cock with the sealing plug.
8. Re-attach all covers to the EPS 708. On attachment,
make sure the protective conductors are connected
to the covers.
9. Perform safety checks in accordance with national
legislation (e.g. VDE 0701/0702 in Germany).
"
The EPS 708 is ready for operation.
Robert Bosch GmbH
Concluding operations | EPS 708 | 49
1 689 978 559
en
|
2017-12-08

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis