Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

GB

OPERATION CONDITION

Before starting up
• As required, push-fit appropriate nozzle.
• Use extension cord of at least 1.5 mm
• The voltage rating stated on the tool should correspond to the mains voltage.
• Power cord and plug must be in perfect condition.
Starting up
Connect tool to mains supply.
10
Step-switch position
Step-switch position
Step-switch position
Step 0
2
cross-sectional.
0 :
Tool is switched off
I :
Tool heats to 350°C. Reduced air flow
II :
Tool heats to 500°C. Maximum air flow
Step I
Step II

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis