Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Instructions - Twin Pipe - elco THISION L 50 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für THISION L 50:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Installation
Air/Flue gas system

Installation Instructions - twin pipe -

Installation
ce must be carried out by a compe-
tent person in accordance with these
installation instructions
General
Store material inside.
Check the components on possi-
ble damages.
Fill out chimney label (when supplied)
and place it near boiler adaptor.
Pipes must be installed free of
tension.
The sockets must be pointing to
the terminal.
24
All manuals and user guides at all-guides.com
Cutting the pipe
Take out the inner tube by turning
-
it until it releases from its security
position
Cut the pipe
Take off the burrs from the cutting
edge to prevent cutting the seals
Re assembles the pipes
Starting to assemble the pipes from
the boiler.
Assemble the pipes by turning and
pushing them till the bottom of the
joint.
Use only water as lubricant.
Before pipe exensions:
When using bends, the maximum
can be deducted from the table on
pag.21.
Important
mable wall
Cleaning
Outside can be cleaned with a wet
towel or with some detergent.
8-15 mm
Ø < 100 mm
Ø
130 mm
-

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis