OIL FILTER, WATER PUMP AND CRANKCASE COVER
(RIGHT)
Kick crank
1. Install:
Kick crank 1
G
Plain washer
G
Bolt (kick crank)
G
NOTE:
Install the kick crank so that the kick crank is
as vertical as possible with the distance a
between the kick crank and the frame being
5 mm (0.20 in) or more.
2. Install:
Oil hose 1
G
Bolt (oil hose) 2
G
3. Install:
Copper washer 1
G
Oil delivery pipe 2
G
Union bolt (M8) 3
G
Union bolt (M10) 4
G
Water pump housing
1. Install:
Dowel pin 1
G
O-ring 2
G
4 - 68
ENG
33 Nm (3.3 m · kg, 24 ft · lb)
10 Nm (1.0 m · kg, 7.2 ft · lb)
New
18 Nm (1.8 m · kg, 13 ft · lb)
20 Nm (2.0 m · kg, 14 ft · lb)
New