Rack installation

Siemens Building Technologies
Fire Safety & Security Products
Overheating of the device
In case of overheating the device will shut down automatically.
All 4 LEDs on the front of the device will be lit red.
1. Pull the power plug and allow the device to cool down.
2. Wait for at least 2 hours for the device to cool down.
IMPORTANT
3. Check to ensure there is a minimum clearance of 85 mm on both sides of
the device.
4. Measure the ambient temperature. See Section : 3 Technical data.
5. Connect the power plug again.
6. Then restart the device.
1.
Unscrew the machine screw (M 4 x 10) and the two self-tapping screws
(4.5 x 16) on both sides of the device.
2.
Put the screws aside.
3.
Remove the white plastic washers.
Damage caused by wrong type of screws
CAUTION
Screws that are too long may cause damage to the device.
Use only the screws included in the delivery (4.5 x 25).
4.
Attach the brackets to the sides of the device using the two self-tapping
screws (4.5 x 25) and the M4x10 screw provided on the device.
See Fig. 1.
5.
Insert the M6 captive nuts for securing the device into the profile rails of the
rack.
6.
Attach the device to the profile rails of the rack using the M6x18 screws and
plastic washers. See Fig. 1.
To ensure sufficient ventilation
1.
Leave a space of one rack unit (RU) after every 3
2.
The device must be installed with a minimum clearance of 85 mm on both
sides.
Fig. 1
SISTORE CX4 rack installation
Installation