Measures to be taken before start-up
Get the start up or commissioning testing done by an author-
ised agent according to the national requirements of the
country of installation.
Rinse the firmly installed water pipes at the installation site.
Establish electrical connections according to the technical
data or details on the type plate.
Inspect the plant and find out the answers to the following
questions:
– Is the entire high pressure unit connected properly?
– Are all joints leak-proof?
Plant type:
Certification:
The plant has been properly installed by
(Name, Address):
Signature/ Date
– Is the decalcification unit ready for operation?
– Is there adequate water supply and is the water temperature
– Is the rotating direction of the burner motor (see direction ar-
– Are the temperature settings on the thermostats "hot water"
– Are the overflow pipes for the swimmer tank and the safety
Release safety and controlling mechanisms (safety tempera-
Installation certification / Startup testing
Manufact. no.:
Start-up on:
Signature of the approved monitoring agency/ date
18
-
EN
within permissible limits?
row on the casing) OK?
and "steam stage" OK?
valve "high pressure outlet" connected properly?
ture stop, exhaust temperature stop).
41