Measures to be taken before start-up
 Get the start up or commissioning testing done by an author-
ised agent according to the national requirements of the
country of installation.
 Rinse the firmly installed water pipes at the installation site.
 Establish electrical connections according to the technical
data or details on the type plate.
 Inspect the plant and find out the answers to the following
questions:
– Is the entire high pressure unit connected properly?
– Are all joints leak-proof?
Plant type:
Certification:
The plant has been properly installed by
(Name, Address):
Signature/ Date
– Is the decalcification unit ready for operation?
– Is there adequate water supply and is the water temperature
– Is the rotating direction of the burner motor (see direction ar-
– Are the temperature settings on the thermostats "hot water"
– Are the overflow pipes for the swimmer tank and the safety
 Release safety and controlling mechanisms (safety tempera-
Installation certification / Startup testing
Manufact. no.:
Start-up on:
Signature of the approved monitoring agency/ date
18
-
EN
within permissible limits?
row on the casing) OK?
and "steam stage" OK?
valve "high pressure outlet" connected properly?
ture stop, exhaust temperature stop).